Marley Advanced Life4 Flowline, 112mm x 60mm Rectangular Angles. 90 degree, 45 degree & irregular angles available in Black, Brown, White & Anthracite Grey.
Special gutter angles are available to order. Please state angles required.
Fascia Brackets must not exceed 1m centres (800mm for Stormflo). Installed with either 68mm or 65mm square downpipes.
Life4 rainwater systems can withstand exposure for up to four times longer than standard PVCu rainwater gutters and downpipes and have high gloss levels that are consistent with the fittings, improving the overall aesthetic of the system.
Manufacturer: Marley
Product Code: RAF1 / RAF2 / RFB102
Download Guides
Top